| Arc Energy
Resources has been supporting pressure vessel
buiiders with our weld overlay cladding services for many
years.
|
For fabricators of ‘U’
stamp vessels, the ASME Code requirement that any welding activities
must be carried out in an accredited shop has been a significant
challenge when subcontracting weld overlay cladding, e.g. for
vessel nozzles. |
Now, as the only weld overlay
specialist in Western Europe to hold the ‘U’ and ‘R’ certificates,
we are the ideal partner to overcome this problem, being able
to deliver all of your subcontract cladding requirements.
|
| We can overlay customer free-issued
parts or supply complete components including: |
| |
• Nozzles, as small as 2” NB
• LR and SR Elbows, tees, reducers etc.
• Clad pipe, supplied straight or induction bent.
• Dished ends for vessels and exchangers
• Vessel strakes up to 3m in diameter, 6m long
• Heat exchanger tubesheets
• Fabricated piping sub-assemblies in weld overlay •
clad or solid CRA materials |
| |
For more information contact
us on:
T: +44 (0)1453 823523
M: +44 (0) 7872 600243
E: alan.brown@arcenergy-ustamp.com
|